Labels

Thursday 26 December 2013

PROJECT 6: AMPHITHEATRE STAGE  (MODEL)


For this project, we need to build a model base on presentation drawing and use the scale of the model is (1:5 scale). Our group are very unity and work together to build this model. Every person take a part and join for done this project. We face a lot of challenges when we constructing our model base on our design, at the first our roof can't be stand because our roof shape is curve, i start notice that our curve are very long So the span can not support and more compression and less tensile. So we sit together and start discuss our problem.I give some idea how to create a tensile for this curve roof. Alhamdulilah it work it and this roof can stand properly. For interior we try to create different to other group, so get the idea and say why we don't try to made traditional instrument and my friend Firaz come out with idea to made Wayang Kulit as our human figure.

I also feel thank full because our group member give fully commitment to done this project. Everyone's willing to face this pain in order to achieve the gain. I would like to say CONGRATULATION DIVERSONE and all of u are superb groupmates for this project.

Let see our pictures on the submission day:-


our group member :)

so proud to see the final product :)

 our stage with the lighting at the night :)

our stage with the interior (traditional instrument & Wayang Kulit)


                                                       actual fish in the glass ponds  :)



No comments:

Post a Comment